Refurbishment Riga HPP

Refurbishment of the concrete slope reinforcements of the  Riga HPP dam headrace in sections  from PK 51+76 to PK 64+92 with the length of 1300 m  and total area of  26,000 sq. m.  Work types: removal of concrete, reinforcement work, formwork installation, concrete works. Works completion time: 5 months. Customer: Energoremonts Riga, LLC